      "question": "How much does commercial construction cost per square foot in Texas?",
      "answer": "Texas commercial construction in 2026 typically runs $180–$450 per square foot for ground-up work: office at $250–$400, retail shell at $150–$275, warehouse/industrial at $85–$160, and healthcare at $400–$800+. Tenant improvements run $40–$150 per square foot.",
      "source": "https://yrcon.com/faq",
      "category": "Cost"
    },
    {
      "question": "How long does a commercial construction project take?",
      "answer": "Tenant improvements typically run 8–16 weeks of construction after permit, plus 4–8 weeks of design and permitting. Ground-up commercial buildings under 50,000 sq ft usually take 8–12 months from ground-break to certificate of occupancy.",
      "source": "https://yrcon.com/faq",
      "category": "Schedule"
    },
    {
      "question": "What contract type is best — GMP, Lump Sum, or Cost-Plus?",
      "answer": "Lump Sum offers the most price certainty when drawings are 100% complete. GMP works best when you need to start before design is fully finished but still want a cap. Cost-Plus fits fast-track and highly custom work, usually paired with a GMP cap.",
      "source": "https://yrcon.com/faq",
      "category": "Contracts"
    },
    {
      "question": "How do I pick the right commercial general contractor?",
      "answer": "Verify bonding capacity (at least 1.5x contract value single-project), safety EMR under 1.0, relevant recent project experience, financial statements, and check three references from projects similar in size and type to yours.",
      "source": "https://yrcon.com/faq",
      "category": "Hiring"
    },
    {
      "question": "How many bids should I get on a commercial project?",
      "answer": "Three qualified bids is standard. More than five rarely improves pricing and often hurts it — top contractors decline to bid crowded lists. Prequalify before inviting bids.",
      "source": "https://yrcon.com/faq",
      "category": "Bidding"
    },
    {
      "question": "Where does Yellowrose Construction Services work?",
      "answer": "We're headquartered in Houston and work statewide across Texas, including Houston, Dallas, Fort Worth, Austin, San Antonio, Plano, Frisco, Katy, The Woodlands, Sugar Land, Corpus Christi, and Galveston.",
      "source": "https://yrcon.com/faq",
      "category": "Yellowrose"
    },
    {
      "question": "What size projects does Yellowrose take on?",
      "answer": "Our sweet spot is $500,000 to $20 million commercial projects — ground-up, tenant improvements, roofing, and renovations.",
      "source": "https://yrcon.com/faq",
      "category": "Yellowrose"
    },
    {
      "question": "Is Yellowrose Construction Services woman-owned?",
      "answer": "Yes. Yellowrose is a Women's Business Enterprise (WBE) and a veteran-founded commercial general contractor. We also hold Texas HUB certification.",
      "source": "https://yrcon.com/faq",
      "category": "Yellowrose"
    },
    {
      "question": "What services does Yellowrose provide?",
      "answer": "Commercial general contracting (ground-up and tenant improvements), commercial building maintenance, commercial roofing, waterproofing, and porter services.",
      "source": "https://yrcon.com/faq",
      "category": "Yellowrose"
    },
    {
      "question": "What is design-build?",
      "answer": "Design-Build consolidates the architect, engineers, and contractor under one contract accountable to the owner. It speeds delivery and gives you one point of accountability for cost and schedule.",
      "source": "https://yrcon.com/faq",
      "category": "Delivery"
    },
    {
      "question": "What is CM at Risk?",
      "answer": "CM at Risk brings the construction manager in during design as an advisor, then converts them to a GC at a Guaranteed Maximum Price. It combines collaborative preconstruction with price certainty.",
      "source": "https://yrcon.com/faq",
      "category": "Delivery"
    },
    {
      "question": "How long does commercial permitting take in Houston?",
      "answer": "Houston commercial plan review typically takes 6–12 weeks for a first submittal, with 2–4 week correction cycles. Simple TIs are faster; complex ground-up work runs longer.",
      "source": "https://yrcon.com/faq",
      "category": "Permitting"
    },
    {
      "question": "When is TAS review required in Texas?",
      "answer": "Texas requires TAS (Texas Accessibility Standards) review for any commercial project with construction cost of $50,000 or more. A Registered Accessibility Specialist (RAS) performs plan review and inspection.",
      "source": "https://yrcon.com/faq",
      "category": "Permitting"
    },
    {
      "question": "What is retainage on a commercial construction contract?",
      "answer": "Retainage is a percentage (typically 5–10%) withheld from each progress payment as security, released at substantial or final completion.",
      "source": "https://yrcon.com/faq",
      "category": "Payments"
    },
    {
      "question": "How are commercial construction payments structured?",
      "answer": "Contractors bill monthly via a Pay Application (AIA G702/G703 or equivalent) tied to a Schedule of Values, less retainage. Lien waivers are exchanged with each payment.",
      "source": "https://yrcon.com/faq",
      "category": "Payments"
    },
    {
      "question": "What warranty do commercial GCs provide?",
      "answer": "The industry standard is a one-year general warranty from substantial completion covering defects in materials and workmanship. Roofing and equipment carry longer manufacturer warranties (10–30 years).",
      "source": "https://yrcon.com/faq",
      "category": "Warranty"
    },
    {
      "question": "What is Tenant Improvement (TI) in commercial construction?",
      "answer": "Tenant Improvement (TI) refers to the interior construction work performed to customize a leased commercial space for a specific tenant's use. This can include partitions, ceilings, flooring, lighting, HVAC modifications, and finishes.",
      "source": "https://yrcon.com/glossary/tenant-improvement",
      "category": "glossary"
    },
    {
      "question": "What is TI Allowance in commercial construction?",
      "answer": "A TI Allowance is a per-square-foot dollar amount a landlord provides toward the cost of tenant improvements. Anything above the allowance is paid by the tenant, typically amortized into rent or paid up front.",
      "source": "https://yrcon.com/glossary/ti-allowance",
      "category": "glossary"
    },
    {
      "question": "What is White Box in commercial construction?",
      "answer": "A White Box is a commercial space delivered with painted walls, finished ceilings, basic lighting, HVAC distribution, and a finished concrete or sealed floor. It's one step beyond a shell but still requires tenant finish-out.",
      "source": "https://yrcon.com/glossary/white-box",
      "category": "glossary"
    },
    {
      "question": "What is Vanilla Shell in commercial construction?",
      "answer": "A Vanilla Shell (or Vanilla Box) delivers primed drywall, a rough concrete floor, stubbed utilities, and basic HVAC. It's less finished than a white box and requires full TI work.",
      "source": "https://yrcon.com/glossary/vanilla-shell",
      "category": "glossary"
    },
    {
      "question": "What is Warm Shell in commercial construction?",
      "answer": "A Warm Shell includes conditioned air, functional restrooms, electrical service to a panel, and stubbed plumbing — but no interior partitions or finishes.",
      "source": "https://yrcon.com/glossary/warm-shell",
      "category": "glossary"
    },
    {
      "question": "What is Cold Shell in commercial construction?",
      "answer": "A Cold Shell is the most basic delivery: exterior walls, structural floor and roof, and stubbed utilities at the demising wall. All conditioning, restrooms, and finishes are tenant scope.",
      "source": "https://yrcon.com/glossary/cold-shell",
      "category": "glossary"
    },
    {
      "question": "What is Ground-Up Construction in commercial construction?",
      "answer": "Ground-Up Construction is a full project from site work through vertical construction to certificate of occupancy. Includes civil, foundation, structure, envelope, MEP, and interiors.",
      "source": "https://yrcon.com/glossary/ground-up",
      "category": "glossary"
    },
    {
      "question": "What is Tilt-Wall Construction in commercial construction?",
      "answer": "Tilt-Wall (or Tilt-Up) construction uses concrete panels poured horizontally on the building slab, then lifted vertically by crane. It's fast, cost-effective, and dominant in Texas industrial construction.",
      "source": "https://yrcon.com/glossary/tilt-wall",
      "category": "glossary"
    },
    {
      "question": "What is Structural Steel in commercial construction?",
      "answer": "Structural Steel construction uses fabricated steel columns, beams, and joists as the primary load-bearing system. Ideal for long spans, multi-story, and complex geometry.",
      "source": "https://yrcon.com/glossary/structural-steel",
      "category": "glossary"
    },
    {
      "question": "What is Pre-Engineered Metal Building (PEMB) in commercial construction?",
      "answer": "A Pre-Engineered Metal Building is a steel structure designed and fabricated by a manufacturer to specific loads, then erected on-site. Common for warehouses, shops, and hangars.",
      "source": "https://yrcon.com/glossary/metal-buildings",
      "category": "glossary"
    },
    {
      "question": "What is Guaranteed Maximum Price (GMP) in commercial construction?",
      "answer": "A Guaranteed Maximum Price contract sets a not-to-exceed number the GC commits to. Overruns are the contractor's risk; savings are typically shared with the owner per contract.",
      "source": "https://yrcon.com/glossary/gmp",
      "category": "glossary"
    },
    {
      "question": "What is Lump Sum (Stipulated Sum) in commercial construction?",
      "answer": "A Lump Sum contract sets one fixed price for a complete, well-defined scope of work. Requires 100% construction documents to price accurately.",
      "source": "https://yrcon.com/glossary/lump-sum",
      "category": "glossary"
    },
    {
      "question": "What is Cost-Plus Contract in commercial construction?",
      "answer": "In a Cost-Plus contract, the owner reimburses direct construction costs and pays the contractor a fixed or percentage fee. Often combined with a GMP cap.",
      "source": "https://yrcon.com/glossary/cost-plus",
      "category": "glossary"
    },
    {
      "question": "What is Design-Build in commercial construction?",
      "answer": "Design-Build consolidates architect, engineers, and contractor under one contract accountable to the owner. Speeds delivery and reduces owner coordination burden.",
      "source": "https://yrcon.com/glossary/design-build",
      "category": "glossary"
    },
    {
      "question": "What is Design-Bid-Build in commercial construction?",
      "answer": "Design-Bid-Build is the traditional linear delivery: owner hires designer, drawings go to competitive bid, low bidder builds.",
      "source": "https://yrcon.com/glossary/design-bid-build",
      "category": "glossary"
    },
    {
      "question": "What is CM at Risk (CMAR) in commercial construction?",
      "answer": "Construction Manager at Risk brings the CM into preconstruction as an advisor, then converts to a GC role at a GMP. Combines collaborative design with price certainty.",
      "source": "https://yrcon.com/glossary/cm-at-risk",
      "category": "glossary"
    },
    {
      "question": "What is Preconstruction in commercial construction?",
      "answer": "Preconstruction covers estimating, value engineering, constructability review, subcontractor prequalification, permitting strategy, and schedule development before construction starts.",
      "source": "https://yrcon.com/glossary/preconstruction",
      "category": "glossary"
    },
    {
      "question": "What is Value Engineering (VE) in commercial construction?",
      "answer": "Value Engineering is the systematic review of scope, materials, and methods to lower cost while preserving performance and design intent.",
      "source": "https://yrcon.com/glossary/value-engineering",
      "category": "glossary"
    },
    {
      "question": "What is Constructability Review in commercial construction?",
      "answer": "A Constructability Review is the contractor's evaluation of construction documents to flag conflicts, missing information, or inefficient details before pricing and construction.",
      "source": "https://yrcon.com/glossary/constructability-review",
      "category": "glossary"
    },
    {
      "question": "What is Punch List in commercial construction?",
      "answer": "The Punch List is the itemized list of incomplete or deficient work identified at substantial completion. The contractor must resolve every item to reach final completion.",
      "source": "https://yrcon.com/glossary/punch-list",
      "category": "glossary"
    },
    {
      "question": "What is Substantial Completion in commercial construction?",
      "answer": "Substantial Completion is the milestone when the owner can occupy and use the building for its intended purpose, even if minor punch-list items remain. Triggers warranty periods and shifts risk of loss to the owner.",
      "source": "https://yrcon.com/glossary/substantial-completion",
      "category": "glossary"
    },
    {
      "question": "What is Certificate of Occupancy (CO) in commercial construction?",
      "answer": "The Certificate of Occupancy is issued by the local building department confirming the building meets code and can be legally occupied. Required before tenants move in.",
      "source": "https://yrcon.com/glossary/certificate-of-occupancy",
      "category": "glossary"
    },
    {
      "question": "What is Temporary Certificate of Occupancy (TCO) in commercial construction?",
      "answer": "A Temporary CO permits occupancy while minor items remain to be completed by a defined date. Common on retail and TI projects with a hard opening.",
      "source": "https://yrcon.com/glossary/temporary-co",
      "category": "glossary"
    },
    {
      "question": "What is Change Order (CO) in commercial construction?",
      "answer": "A Change Order is a formal, signed amendment to the construction contract adjusting scope, price, and/or schedule. Executed for owner-directed changes, unforeseen conditions, or design revisions.",
      "source": "https://yrcon.com/glossary/change-order",
      "category": "glossary"
    },
    {
      "question": "What is Request for Information (RFI) in commercial construction?",
      "answer": "An RFI is a written question submitted by the contractor to the architect or engineer to clarify drawings, specifications, or field conditions. Responses become part of the contract record.",
      "source": "https://yrcon.com/glossary/rfi",
      "category": "glossary"
    },
    {
      "question": "What is Submittal in commercial construction?",
      "answer": "A Submittal is a document, shop drawing, or product data sample the contractor sends to the design team for review before fabrication or installation.",
      "source": "https://yrcon.com/glossary/submittal",
      "category": "glossary"
    },
    {
      "question": "What is Mockup in commercial construction?",
      "answer": "A Mockup is a full-size sample of a building system (facade, curtain wall, guardrail) built for aesthetic approval, performance testing, or trade coordination.",
      "source": "https://yrcon.com/glossary/mockup",
      "category": "glossary"
    },
    {
      "question": "What is Building Information Modeling (BIM) in commercial construction?",
      "answer": "BIM is a shared digital model of the building used by design, construction, and operations teams to coordinate MEP, detect clashes, sequence work, and hand off data to facilities.",
      "source": "https://yrcon.com/glossary/bim",
      "category": "glossary"
    },
    {
      "question": "What is Clash Detection in commercial construction?",
      "answer": "Clash Detection uses BIM to identify physical conflicts between structure, ducts, pipe, and conduit before fabrication — dramatically reducing rework.",
      "source": "https://yrcon.com/glossary/clash-detection",
      "category": "glossary"
    },
    {
      "question": "What is MEP Coordination in commercial construction?",
      "answer": "MEP Coordination is the process of laying out and sequencing mechanical, electrical, plumbing, and fire protection systems so they fit and install efficiently.",
      "source": "https://yrcon.com/glossary/mep-coordination",
      "category": "glossary"
    },
    {
      "question": "What is Surety Bond in commercial construction?",
      "answer": "A Surety Bond (bid, performance, or payment bond) is a three-party guarantee protecting the owner against contractor default. Standard on public and most institutional work.",
      "source": "https://yrcon.com/glossary/bonding",
      "category": "glossary"
    },
    {
      "question": "What is Contractor Insurance in commercial construction?",
      "answer": "Standard commercial contractors carry General Liability, Workers Compensation, Auto, and often Umbrella policies. Owners should verify certificates and additional insured status before work begins.",
      "source": "https://yrcon.com/glossary/insurance",
      "category": "glossary"
    },
    {
      "question": "What is Additional Insured in commercial construction?",
      "answer": "Additional Insured status extends the contractor's General Liability coverage to the owner (or upstream parties) for claims arising from the contractor's work.",
      "source": "https://yrcon.com/glossary/additional-insured",
      "category": "glossary"
    },
    {
      "question": "What is Retainage in commercial construction?",
      "answer": "Retainage is a percentage (typically 5–10%) held back from each progress payment as security, released at substantial or final completion.",
      "source": "https://yrcon.com/glossary/retainage",
      "category": "glossary"
    },
    {
      "question": "What is Schedule of Values (SOV) in commercial construction?",
      "answer": "The Schedule of Values allocates the contract sum across line items used for progress billing. Owner and GC agree to it before the first pay app.",
      "source": "https://yrcon.com/glossary/schedule-of-values",
      "category": "glossary"
    },
    {
      "question": "What is Pay Application in commercial construction?",
      "answer": "A Pay Application (AIA G702/G703 or equivalent) is the contractor's monthly invoice showing percent complete per SOV line, less retainage.",
      "source": "https://yrcon.com/glossary/pay-application",
      "category": "glossary"
    },
    {
      "question": "What is Lien Waiver in commercial construction?",
      "answer": "A Lien Waiver is a signed document from a contractor, sub, or supplier waiving lien rights for a specific payment period. Conditional versions require actual receipt of funds.",
      "source": "https://yrcon.com/glossary/lien-waiver",
      "category": "glossary"
    },
    {
      "question": "What is Mechanic's Lien in commercial construction?",
      "answer": "A Mechanic's Lien is a statutory claim filed against real property by an unpaid contractor, sub, or supplier. Texas has strict notice and filing deadlines.",
      "source": "https://yrcon.com/glossary/mechanics-lien",
      "category": "glossary"
    },
    {
      "question": "What is Prevailing Wage in commercial construction?",
      "answer": "Prevailing Wage rates are set by the U.S. Department of Labor (Davis-Bacon) or state authority for public construction projects, defining minimum hourly wages by trade.",
      "source": "https://yrcon.com/glossary/prevailing-wage",
      "category": "glossary"
    },
    {
      "question": "What is Site Work in commercial construction?",
      "answer": "Site Work covers all civil scope: clearing, grading, storm drainage, utility connections, paving, curbs, and site concrete.",
      "source": "https://yrcon.com/glossary/site-work",
      "category": "glossary"
    },
    {
      "question": "What is Civil Engineering in commercial construction?",
      "answer": "Civil Engineering produces the site design: grading plan, storm drainage, utility routing, and paving. Required for ground-up permitting.",
      "source": "https://yrcon.com/glossary/civil-engineering",
      "category": "glossary"
    },
    {
      "question": "What is Structural Engineering in commercial construction?",
      "answer": "Structural Engineering designs foundations, columns, beams, and lateral systems to code and load requirements.",
      "source": "https://yrcon.com/glossary/structural-engineering",
      "category": "glossary"
    },
    {
      "question": "What is Geotechnical Report in commercial construction?",
      "answer": "A Geotechnical Report presents soil borings, bearing capacity, and foundation recommendations. Texas expansive soils make this critical.",
      "source": "https://yrcon.com/glossary/geotechnical",
      "category": "glossary"
    },
    {
      "question": "What is Commissioning (Cx) in commercial construction?",
      "answer": "Commissioning is the systematic process of testing and verifying that HVAC, controls, and other systems operate to design intent before turnover.",
      "source": "https://yrcon.com/glossary/commissioning",
      "category": "glossary"
    },
    {
      "question": "What is Warranty Period in commercial construction?",
      "answer": "Most commercial contracts include a one-year general warranty from substantial completion during which the GC corrects defects at no cost. Roofing and equipment carry longer manufacturer warranties.",
      "source": "https://yrcon.com/glossary/warranty",
      "category": "glossary"
    },
    {
      "question": "What is TPO Roofing in commercial construction?",
      "answer": "TPO (Thermoplastic Polyolefin) is a single-ply reflective roof membrane widely used on low-slope commercial roofs. Cost-effective, energy-efficient, and repairable.",
      "source": "https://yrcon.com/glossary/tpo-roofing",
      "category": "glossary"
    },
    {
      "question": "What is EPDM Roofing in commercial construction?",
      "answer": "EPDM is a durable synthetic rubber roof membrane with a 20+ year lifespan. Common on institutional and industrial low-slope roofs.",
      "source": "https://yrcon.com/glossary/epdm-roofing",
      "category": "glossary"
    },
    {
      "question": "What is Modified Bitumen Roofing in commercial construction?",
      "answer": "Modified Bitumen is a multi-ply asphalt-based membrane system, torch- or self-adhered. Robust for high-traffic and mechanically-loaded roofs.",
      "source": "https://yrcon.com/glossary/modified-bitumen",
      "category": "glossary"
    },
    {
      "question": "What is Roof Recover in commercial construction?",
      "answer": "A Roof Recover installs a new membrane over the existing roof without tear-off, allowed when the existing roof is dry and structurally sound. Typically permitted only once.",
      "source": "https://yrcon.com/glossary/roof-recover",
      "category": "glossary"
    },
    {
      "question": "What is Reroof (Tear-Off) in commercial construction?",
      "answer": "A Reroof (tear-off) removes the existing membrane and insulation down to the deck and installs a full new system. Highest cost, longest life.",
      "source": "https://yrcon.com/glossary/reroof",
      "category": "glossary"
    },
    {
      "question": "What is Capital Planning in commercial construction?",
      "answer": "Capital Planning forecasts major system replacements (roof, HVAC, paving, envelope) over 5–20 years so owners can budget accurately.",
      "source": "https://yrcon.com/glossary/capital-planning",
      "category": "glossary"
    },
    {
      "question": "What is Preventive Maintenance (PM) in commercial construction?",
      "answer": "Preventive Maintenance is a recurring schedule of inspections and service (typically quarterly or annually) that extends equipment life and prevents emergency repairs.",
      "source": "https://yrcon.com/glossary/preventive-maintenance",
      "category": "glossary"
    },
    {
      "question": "What is Building Envelope in commercial construction?",
      "answer": "The Building Envelope includes roof, walls, windows, doors, and below-grade waterproofing. Envelope performance drives energy use and moisture control.",
      "source": "https://yrcon.com/glossary/building-envelope",
      "category": "glossary"
    },
    {
      "question": "What is Waterproofing in commercial construction?",
      "answer": "Waterproofing includes below-grade membranes, above-grade air/water barriers, joint sealants, and traffic coatings that keep water out of the structure.",
      "source": "https://yrcon.com/glossary/waterproofing",
      "category": "glossary"
    },
    {
      "question": "What is ADA Compliance in commercial construction?",
      "answer": "ADA Compliance requires accessible routes, parking, restrooms, and elements throughout commercial buildings. Texas TDLR TAS requirements govern accessibility review.",
      "source": "https://yrcon.com/glossary/ada",
      "category": "glossary"
    },
    {
      "question": "What is TAS Review (Texas) in commercial construction?",
      "answer": "TAS Review is Texas' state-specific accessibility plan review and inspection process required for commercial construction projects with construction cost of $50,000 or more. Handled by a Registered Accessibility Specialist (RAS).",
      "source": "https://yrcon.com/glossary/tas-review",
      "category": "glossary"
    },
    {
      "question": "What is Women's Business Enterprise (WBE) in commercial construction?",
      "answer": "A Women's Business Enterprise is a business at least 51% owned, operated, and controlled by one or more women, certified through the WBENC or equivalent authority. WBE participation often satisfies public and corporate supplier diversity goals.",
      "source": "https://yrcon.com/glossary/wbe",
      "category": "glossary"
    },
    {
      "question": "What is Texas HUB Certified in commercial construction?",
      "answer": "HUB certification is Texas' state program for Historically Underutilized Businesses (minority-, woman-, or veteran-owned). Required or preferred on many state agency projects.",
      "source": "https://yrcon.com/glossary/hub-certified",
      "category": "glossary"
    },
    {
      "question": "What is GC Prequalification in commercial construction?",
      "answer": "Prequalification is the owner's review of a contractor's financials, safety record, bonding capacity, insurance, and past performance before including them in bidding.",
      "source": "https://yrcon.com/glossary/prequalification",
      "category": "glossary"
    },
    {
      "question": "What is Fast-Track Construction in commercial construction?",
      "answer": "Fast-Track construction starts construction (site, foundations) before design is 100% complete, compressing the schedule at the cost of some pricing certainty.",
      "source": "https://yrcon.com/glossary/fast-track",
      "category": "glossary"
    },
    {
      "question": "What is the average cost per square foot for commercial construction in Texas?",
      "answer": "Texas ground-up commercial construction generally runs $180–$450 per square foot in 2026, with office at $250–$400, retail shell at $150–$275, warehouse/industrial at $85–$160, and healthcare at $400–$800+.",
      "source": "https://yrcon.com/insights/how-much-does-commercial-construction-cost-texas",
      "category": "Cost"
    },
    {
      "question": "Is Houston cheaper than Dallas for commercial construction?",
      "answer": "Base pricing is close, but Houston tends to run 3–7% lower on shell work due to labor market and a deeper subcontractor pool. Site work in Houston can be higher because of expansive clay soils and detention requirements.",
      "source": "https://yrcon.com/insights/how-much-does-commercial-construction-cost-texas",
      "category": "Cost"
    },
    {
      "question": "How much does a tenant improvement cost per square foot?",
      "answer": "Commercial tenant improvement in Texas typically runs $40–$150 per square foot depending on finish level, MEP scope, and existing conditions.",
      "source": "https://yrcon.com/insights/how-much-does-commercial-construction-cost-texas",
      "category": "Cost"
    },
    {
      "question": "How long does a commercial tenant improvement take?",
      "answer": "A typical Texas commercial tenant improvement runs 8–16 weeks of construction after permit issuance, plus 4–8 weeks of design and permitting.",
      "source": "https://yrcon.com/insights/commercial-construction-timeline-texas",
      "category": "Schedule"
    },
    {
      "question": "How long does ground-up commercial construction take?",
      "answer": "Ground-up commercial buildings under 50,000 sq ft usually take 8–12 months from ground-break to CO. Larger or complex projects run 12–24 months.",
      "source": "https://yrcon.com/insights/commercial-construction-timeline-texas",
      "category": "Schedule"
    },
    {
      "question": "What is the fastest way to shorten a commercial construction schedule?",
      "answer": "Engage the GC in preconstruction, use design-build or CM-at-risk delivery, and release long-lead procurement (structural steel, switchgear, RTUs) before drawings are 100%.",
      "source": "https://yrcon.com/insights/commercial-construction-timeline-texas",
      "category": "Schedule"
    },
    {
      "question": "What is the safest contract type for a commercial owner?",
      "answer": "Lump Sum with complete drawings is the most price-certain, but GMP with a strong preconstruction phase often delivers better value on complex or fast-track work.",
      "source": "https://yrcon.com/insights/gmp-vs-lump-sum-vs-cost-plus",
      "category": "Contracts"
    },
    {
      "question": "Do GMP contracts share savings with the owner?",
      "answer": "Yes — most GMP contracts include a savings-sharing clause, typically 50/50 or 75/25 in the owner's favor, applied to any unused contingency at closeout.",
      "source": "https://yrcon.com/insights/gmp-vs-lump-sum-vs-cost-plus",
      "category": "Contracts"
    },
    {
      "question": "What EMR is considered good for a commercial GC?",
      "answer": "An Experience Modification Rate below 1.0 is average; below 0.85 is strong. Most institutional owners require an EMR under 1.0 to prequalify.",
      "source": "https://yrcon.com/insights/how-to-pick-a-commercial-general-contractor",
      "category": "Hiring"
    },
    {
      "question": "How much bonding capacity should a commercial GC have?",
      "answer": "For most $500K–$20M projects, expect a GC to demonstrate single-project bonding capacity of at least 1.5x the contract value and aggregate capacity of at least 3x.",
      "source": "https://yrcon.com/insights/how-to-pick-a-commercial-general-contractor",
      "category": "Hiring"
    },
    {
      "question": "Who pays for tenant improvements?",
      "answer": "Landlords typically fund a TI Allowance ($20–$80/sf in Texas); the tenant pays anything above the allowance, either up front or amortized into rent.",
      "source": "https://yrcon.com/insights/tenant-improvement-guide",
      "category": "Tenant Improvement"
    },
    {
      "question": "How long does a tenant improvement take?",
      "answer": "Most Texas commercial TIs run 8–16 weeks of construction after permit, plus 4–8 weeks of design and permitting.",
      "source": "https://yrcon.com/insights/tenant-improvement-guide",
      "category": "Tenant Improvement"
    },
    {
      "question": "Which is cheaper, tilt-wall or metal building?",
      "answer": "For buildings under 20,000 sq ft, PEMB is usually cheaper. Over 40,000 sq ft, tilt-wall is typically more economical and offers better fire ratings and durability.",
      "source": "https://yrcon.com/insights/tilt-wall-vs-metal-building",
      "category": "Construction Methods"
    },
    {
      "question": "How much does a commercial roof cost in Texas?",
      "answer": "TPO runs $5–$10/sf installed, EPDM $6–$12/sf, and modified bitumen $7–$14/sf, before insulation upgrades or tear-off costs.",
      "source": "https://yrcon.com/insights/commercial-roof-replacement-cost",
      "category": "Roofing"
    },
    {
      "question": "How long does a commercial roof last in Texas?",
      "answer": "TPO 15–20 years, EPDM 20–30 years, modified bitumen 15–25 years — hail exposure is the biggest variable.",
      "source": "https://yrcon.com/insights/commercial-roof-replacement-cost",
      "category": "Roofing"
    },
    {
      "question": "How long does a commercial building permit take in Houston?",
      "answer": "Houston commercial plan review typically takes 6–12 weeks for a first submittal, with 2–4 week corrections cycles. Simple TIs can be faster; complex ground-up longer.",
      "source": "https://yrcon.com/insights/commercial-permit-process-texas",
      "category": "Permitting"
    },
    {
      "question": "When is TAS review required?",
      "answer": "Texas requires TAS (Texas Accessibility Standards) review on any commercial project with construction cost of $50,000 or more.",
      "source": "https://yrcon.com/insights/commercial-permit-process-texas",
      "category": "Permitting"
    },
    {
      "question": "What is a WBE contractor?",
      "answer": "A Women's Business Enterprise (WBE) is a business at least 51% owned, operated, and controlled by women, certified by WBENC or an equivalent authority.",
      "source": "https://yrcon.com/insights/wbe-veteran-owned-contractor-benefits",
      "category": "Procurement"
    },
    {
      "question": "What is a typical change order percentage on commercial construction?",
      "answer": "5–10% of contract value is common on well-designed projects; 15%+ signals design or scope issues that should be addressed at the source.",
      "source": "https://yrcon.com/insights/construction-change-order-management",
      "category": "Project Management"
    },
    {
      "question": "What should a commercial preventive maintenance program cover?",
      "answer": "At minimum: HVAC quarterly, roof biannual inspection, plumbing annual, electrical annual (IR scan every 3 years), and fire life-safety per code.",
      "source": "https://yrcon.com/insights/commercial-building-maintenance-guide",
      "category": "Maintenance"
    },
    {
      "question": "Where is industrial construction growing in Houston?",
      "answer": "Northwest Houston, Baytown/east port corridor, and the SH-99 corridor around Katy are the highest-growth industrial submarkets in 2026.",
      "source": "https://yrcon.com/insights/houston-industrial-construction-trends",
      "category": "Market"
    },
    {
      "question": "What is a typical office TI allowance in DFW?",
      "answer": "Class A DFW office TI allowances typically run $60–$110/sf in 2026, with landlords increasingly willing to fund higher amounts on longer-term leases.",
      "source": "https://yrcon.com/insights/dfw-office-tenant-improvement-trends",
      "category": "Market"
    },
    {
      "question": "What are general conditions in a construction bid?",
      "answer": "General Conditions cover project management, supervision, temporary utilities, safety, cleanup, and other non-trade costs. Typically 6–12% of the contract sum on commercial work.",
      "source": "https://yrcon.com/insights/how-to-read-a-construction-bid",
      "category": "Bidding"
    },
    {
      "question": "How much equity do lenders require for a commercial construction loan?",
      "answer": "Most commercial construction loans require 20–35% owner equity, with the range depending on asset class, pre-leasing, and borrower strength.",
      "source": "https://yrcon.com/insights/commercial-construction-financing",
      "category": "Finance"
    },
    {
      "question": "Are cool roofs required in Texas?",
      "answer": "Many Texas jurisdictions adopt IECC provisions that effectively require reflective (cool) roofs on low-slope commercial. Check the AHJ before spec.",
      "source": "https://yrcon.com/insights/sustainable-commercial-construction-texas",
      "category": "Sustainability"
    },
    {
      "question": "What safety documentation should a commercial GC provide?",
      "answer": "Expect a site-specific safety plan, JHAs for high-hazard work, a competent-person list, and weekly toolbox talk documentation.",
      "source": "https://yrcon.com/insights/commercial-construction-safety",
      "category": "Safety"
    },
    {
      "question": "When should a GC be engaged for preconstruction?",
      "answer": "As early as schematic design (SD). Waiting until 100% CDs eliminates most of preconstruction's value.",
      "source": "https://yrcon.com/insights/preconstruction-services-value",
      "category": "Preconstruction"
    },
    {
      "question": "How long is a commercial construction warranty in Texas?",
      "answer": "Standard general warranty is one year from substantial completion. Roof and equipment warranties run 10–30 years per manufacturer. Latent defects can carry longer statutory exposure.",
      "source": "https://yrcon.com/insights/commercial-construction-warranty",
      "category": "Warranty"
    },
    {
      "question": "What is a punch list?",
      "answer": "A punch list is the itemized list of incomplete or deficient work identified at substantial completion. The contractor must resolve every item to reach final completion.",
      "source": "https://yrcon.com/insights/commercial-construction-glossary",
      "category": "Reference"
    },
    {
      "question": "Which is cheaper: Design-Build or CM-at-Risk in Texas?",
      "answer": "Design-Build is typically 3–7% lower total delivered cost on projects under $5M because of overlapped design and build and lower coordination overhead. Above $10M, CM-at-Risk often matches or beats Design-Build because open-book subcontractor bidding surfaces savings.",
      "source": "https://yrcon.com/compare/design-build-vs-cm-at-risk-texas",
      "category": "comparison"
    },
    {
      "question": "Can Design-Build be used on Texas public projects?",
      "answer": "Yes, under Texas Government Code Chapter 2269, but it's restricted by entity type and requires specific procurement steps. CM-at-Risk is more broadly available for public work.",
      "source": "https://yrcon.com/compare/design-build-vs-cm-at-risk-texas",
      "category": "comparison"
    },
    {
      "question": "Which method has less risk for the owner?",
      "answer": "Design-Build shifts more design risk to the GC because they own both design and construction. CM-at-Risk keeps design risk with the owner and their architect.",
      "source": "https://yrcon.com/compare/design-build-vs-cm-at-risk-texas",
      "category": "comparison"
    },
    {
      "question": "Is tilt-wall cheaper than steel frame in Texas?",
      "answer": "Tilt-wall shell construction typically runs $55–$85 per sq ft in Texas versus $75–$120 for structural steel, so tilt-wall is 15–30% cheaper for straightforward warehouses under 32-foot clear height.",
      "source": "https://yrcon.com/compare/tilt-up-vs-steel-frame-warehouse-texas",
      "category": "comparison"
    },
    {
      "question": "When does steel frame make more sense?",
      "answer": "Steel wins when clear heights exceed 36 feet, spans exceed 60 feet, the building will expand vertically, or the use requires heavy cranes or overhead conveyors.",
      "source": "https://yrcon.com/compare/tilt-up-vs-steel-frame-warehouse-texas",
      "category": "comparison"
    },
    {
      "question": "Which has faster construction schedule?",
      "answer": "Tilt-wall is typically 3–6 weeks faster to dry-in on a comparable warehouse because panels are cast on the slab and erected in one to two weeks.",
      "source": "https://yrcon.com/compare/tilt-up-vs-steel-frame-warehouse-texas",
      "category": "comparison"
    },
    {
      "question": "Which is better in Houston heat, TPO or EPDM?",
      "answer": "TPO's reflective white surface reduces rooftop temperature by 50–70°F versus black EPDM, which cuts cooling costs 10–15% in Houston's climate. TPO is the default choice for most Houston commercial roofs.",
      "source": "https://yrcon.com/compare/tpo-vs-epdm-commercial-roofing-texas",
      "category": "comparison"
    },
    {
      "question": "How long does TPO last in Texas?",
      "answer": "Properly installed TPO in Texas lasts 20–30 years, matching its manufacturer warranty. UV exposure and ponding water are the two failure drivers to design against.",
      "source": "https://yrcon.com/compare/tpo-vs-epdm-commercial-roofing-texas",
      "category": "comparison"
    },
    {
      "question": "Is EPDM ever the right choice in Texas?",
      "answer": "Yes — for heavily shaded roofs, mechanical decks with constant foot traffic, or ballasted systems on structurally strong roofs. In North Texas microclimates with more freeze cycles, EPDM's cold flexibility is a genuine advantage.",
      "source": "https://yrcon.com/compare/tpo-vs-epdm-commercial-roofing-texas",
      "category": "comparison"
    },
    {
      "question": "Is Lump Sum or GMP cheaper for the owner?",
      "answer": "On a fully-designed straightforward project, Lump Sum usually delivers the lowest total cost because contractors sharpen their pencils to win. On complex or evolving scope, GMP typically saves money because open-book bidding and shared savings surface value the owner would never see in a lump-sum bid.",
      "source": "https://yrcon.com/compare/lump-sum-vs-gmp-contract-commercial-construction",
      "category": "comparison"
    },
    {
      "question": "Do change orders cost more under Lump Sum?",
      "answer": "Yes. Under Lump Sum, every scope change is priced individually and often includes overhead and profit markups. Under GMP, minor changes are frequently absorbed within the cap.",
      "source": "https://yrcon.com/compare/lump-sum-vs-gmp-contract-commercial-construction",
      "category": "comparison"
    },
    {
      "question": "Which contract type does Yellowrose recommend?",
      "answer": "We deliver both. Ground-up builds under $5M with complete drawings usually go Lump Sum. Renovations, phased projects, and $5M+ builds typically go GMP with open-book subcontractor pricing.",
      "source": "https://yrcon.com/compare/lump-sum-vs-gmp-contract-commercial-construction",
      "category": "comparison"
    }
  ]
}